View project

Do You Need Council Approval for a Home Extension?

← Back to blog

It depends on the project and the site. In NSW, residential work may be exempt development, complying development or development requiring a development application.

Kitchen renovation from a Ridgeline Construction project in Glebe, Sydney

The three terms homeowners hear most

Exempt development

NSW Planning says many types of minor home renovations and small building projects, such as a carport, balcony, deck or garden shed, do not need planning or building approval when they meet specific development standards and land requirements.

Complying development

NSW Planning describes complying development as a combined planning and construction approval for straightforward development that can be determined through a fast-track assessment by a council or an accredited certifier. It allows for things like a new dwelling house or alterations and additions to a house.

Development application (DA)

A DA is a formal application for development consent, usually made to the local council. The organisation that assesses and determines a DA or complying development certificate is called the consent authority. NSW Planning says receiving development consent does not mean you can start building: a Construction Certificate from your council or an accredited certifier is one of the steps needed before building work starts.

What can rule out the simpler pathway?

Complying development depends on meeting the relevant development standards and land requirements. For example, the NSW Planning Portal says external alterations to a dwelling house in a heritage conservation area must meet extra conditions to be complying development. The exact planning controls for the property should be checked rather than assumed.

Who chooses the certifier?

NSW consumer guidance says residential building contracts worth more than $5,000 that require a certifier must include terms about the homeowner's freedom to choose their own certifier (unless the homeowner is a developer). It says this is the homeowner's responsibility, not the builder's, and that it is an offence for a contractor to unduly influence the homeowner's choice of certifier.

Important: "Council approval" is often used casually, but a complying development certificate can also be issued by an accredited certifier. The right pathway is property-specific.

Sources checked

General information only. This guide is not legal, planning, heritage, engineering, certification, financial or cost-planning advice. Requirements depend on the property, documentation, approval pathway and proposed work. Check current requirements with the relevant authority and obtain project-specific professional advice.

Planning a project?

Talk to Ridgeline about your home, your plans and what's possible.

Book a consultation