Both contract models can be used for residential building work, but they allocate price certainty and cost risk differently. NSW consumer guidance describes fixed-price contracts as an agreed upfront amount, while cost-plus contracts do not guarantee a final project cost.
Under a fixed-price or lump-sum arrangement, the builder agrees to an upfront contract amount for the defined work. That does not mean the final amount can never change: NSW guidance notes that unforeseen changes during construction may affect the final cost, and variations must be in writing and signed by both parties.
Under a cost-plus arrangement, NSW guidance says the homeowner repays the builder for verified direct and indirect costs and fees at regular intervals. There is no guaranteed final cost. The guidance says it is good practice for the builder to give a non-binding estimate before starting, and to track costs with the homeowner against the project's budgeted estimate.
Which one is right depends on the project, the documentation and the risks involved. If you are unsure about the contract terms, consider getting independent legal advice.
General information only. This guide is not legal, planning, engineering, certification, financial or cost-planning advice. Requirements depend on the work and applicable NSW rules. Check current requirements with the relevant authority and obtain project-specific professional advice.
Talk to Ridgeline about your home, your plans and what's possible.
Book a consultation