The construction period is only one part of an extension timeline. Design development, consultant reports, approvals, builder pricing, selections, procurement and site work all need to be considered.
This stage establishes what the site can accommodate, what the homeowner wants to achieve and whether the concept is likely to fit the budget and planning controls.
Architectural drawings, engineering, surveys and other specialist reports are developed. Heritage, bushfire, flooding or other site constraints may add consultant work.
The time depends on the pathway. NSW Planning states that fast-tracked complying development approvals can be issued in as little as 20 days where the proposal qualifies and meets the applicable requirements. This is not a guaranteed timeframe for every proposal. A development application follows a different assessment process.
A reliable proposal depends on the completeness of the documentation and selections.
The build duration depends on demolition, structure, weather exposure, services, finishes, access, long-lead items and unforeseen existing conditions. A project-specific construction program is more meaningful than a generic online duration.
General information only. This guide is not legal, planning, heritage, engineering, certification, financial or cost-planning advice. Project timeframes depend on the property, design, documentation, approvals, procurement and actual site conditions. Obtain project-specific professional advice where appropriate.